Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering




Cost: $5.5 million
Project Length: 1.2 Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

(Roadway Reconstruction) - This project realignment S.R. 1001 (Farrandsville Road) to satisfy criteria and
provide needed turning lanes. The project also includes an 800’ retaining wall to minimize encroachment on the
West Branch of the Susquehanna River due to the proposed widening.

BACK