Cost: 18.0 Million
Project Length: 12-Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

(Roadway and Bridge Reconstruction) - This project included a Five Span (Overall span length – 344’-4”) Continuous
Composite Prestressed Concrete Bridge carrying S.R. 0153 over S.R. 0080 (I-80); a single (49’-8 1/2”) Span Composite
Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek; and a single (50’-7 5/8”) Span Composite Prestressed
Concrete Bridge carrying S.R. 0322 over Moose Creek. It also included the reconstruction of a major Interchange between
S.R. 0080 (I-80) with S.R. 0153.