Cost: $191,000.00
Client: PennDOT Engineering District 9-0


Boynton Bridge Preservation - The primary focus was to underpin the scour-critical
Boynton Bridge. Reinforced concrete underpinning was constructed in an undermined area
of an abutment. A Cross-Rock Vane and J-Hook Vane were installed upstream and downstream
respectively, and rock protection was installed at the pier to mitigate future scour.
Minor concrete repairs were also included in the contract.