![]() ![]() Cost: $191,000.00 Client: PennDOT Engineering District 9-0 Boynton Bridge Preservation - The primary focus was to underpin the scour-critical Boynton Bridge. Reinforced concrete underpinning was constructed in an undermined area of an abutment. A Cross-Rock Vane and J-Hook Vane were installed upstream and downstream respectively, and rock protection was installed at the pier to mitigate future scour. Minor concrete repairs were also included in the contract. BACK |
||||||||||