![]() ![]() ![]() Cost: $720,00.00 Client: Engineering District 10-0 contact Mr. Mark Rozich, P.E. (724-357-2852) Bell’s Mills Intersection Improvement - The project consisted of the addition of a left turn lane as well as excavation and grading of the existing slopes to improve intersection sight distance. Two (2) residential structures were displaced as a result of the excavation. In addition, resurfacing and shoulder reconstruction was performed. BACK |
||||||||||