Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering




Cost: $1.84 million
Project Length: 1.294 km
Client: Engineering District 1-0
Contact: Mr. Anthony Zambelli (814-678-7356)

This project was designed for the widening of 1.294 km of roadway and five (5) traffic signals.


BACK