Cost: $2.6 Million
Project Length: 950 feet
Client: Engineering District 1-0

Devil’s Elbow Bridge Superstructure Replacement - This project included a Four-Span (Overall span length – 600’) Continuous Composite
Steel Deck Girder Bridge carrying S.R. 0059 over Jakes Run. The entire length of the project was 950 feet.