![]() ![]() Cost: $1.6 million Project Length: Approximately 510 Feet Client: PennDOT Engineering District 9-0 Contact: Bill Ratchford and Nick Vivian (814-696-7197) Bridge Superstructure Replacement - The project included a two span (106’ – 6” c/c brgs.) Continuous Composite Galvanized Steel I-Beam bridge over the Beaverdam Branch of Juniata River. The project included approximately 400 feet of roadway approach work and utilized a phased construction sequence to maintain traffic throughout construction. BACK |
||||||||||