Cost: $1.93 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Bill Ratchford (814-696-7159)

Duncansville Bridge - This project includes a single span (68.0’ c/c brgs.) precast concrete adjacent box beam bridge over
Blair Gap Run. The project also includes minor approach roadway reconstruction, two waterline replacements, complex phasing
and utility phasing requirements in order to maintain traffic during construction.