Cost: $3.6 million
Project Length: 1.35 Miles
Client: PennDOT Engineering District 1-0
(Peach Street) Roadway Improvements (5 Intersections) -This project consisted of widening S.R. 0019 to accommodate
a fifth center turning lane. It was located in a highly commercialized congested area. The project also included
the design of a coordinated signal system (Six 6 signals).