![]() |
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
||||||||||
|
||||||||||
![]() Cost: $3.6 million Project Length: 1.35 Miles Client: PennDOT Engineering District 1-0 (Peach Street) Roadway Improvements (5 Intersections) -This project consisted of widening S.R. 0019 to accommodate a fifth center turning lane. It was located in a highly commercialized congested area. The project also included the design of a coordinated signal system (Six 6 signals). BACK |
||||||||||