Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering





Project Cost: $1.44 million
Project Length: 504'
Project Letting - 2011
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Bald Eagle Creek - This project included the replacement of an existing bridge with a prestressed concrete
spread box beam bridge (79’ span). The project also included 425’ of approach roadway reconstruction.

BACK