Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: S.R. 0522 Section 16B

S.R. 0522 Section 16B

Michael Kilgore

After

After

Before

After

Project Cost: $441,301
Client: PennDOT District 9-0
Contact: Jacklyn Himmelwright (814-696-7171)
Project Letting: January 2018
Contractor: Wen-Brooke Contracting, Inc.

This project includes the replacement of an existing slab bridge carrying S.R. 0522 over Tributary to Big Cove Creek. After reviewing the site constraints, including utilities, buildings, and a billboard, and the difficulties associated with phasing the replacement, SPK, in conjunction with PennDOT, decided to advance an Accelerated Bridge Construction (ABC) option. This option included a  weekend detour of the 2,500 ADT, facilitated through the extensive use of precast components. Early communication with area businesses was critical in securing buy-in for this ABC approach. 

Back