![]() ![]() 10.11.06 Gallery 10.16.06 Girder Erection Gallery 10.25.06 Gallery 03.22.07 Gallery Project Cost: $5 Million Project Length: 0.38 Mile Client: Pennsylvania Turnpike Contact: Brad Updegrave, P.E., (717-939-9551 x-3675) (Bridge Replacement) - Franklin County - This project includes the replacement of two (2) separate bridges carrying S.R. 4006 (Cold Springs Road) over the eastbound and westbound Pennsylvania Turnpike with a two-span continuous curved-steel plate girder bridge (344’ total span). The roadway was realigned to permit uninterrupted traffic on S.R. 4006 throughout construction. The project also includes high-mast lighting, drainage, temporary lighting, and traffic control provisions on the Turnpike for demolition and erection activities. The design team included Earth, Inc. BACK |
||||||||||